{"id":51997,"date":"2025-06-17T13:10:46","date_gmt":"2025-06-17T10:10:46","guid":{"rendered":"https:\/\/orsiad.com.tr\/?p=51997"},"modified":"2025-06-17T13:10:46","modified_gmt":"2025-06-17T10:10:46","slug":"concrete-mixer-trucks-should-be-granted-right-of-way-in-traffic-for-safe-buildings","status":"publish","type":"post","link":"https:\/\/orsiad.com.tr\/en\/concrete-mixer-trucks-should-be-granted-right-of-way-in-traffic-for-safe-buildings.html","title":{"rendered":"\u201cConcrete Mixer Trucks Should Be Granted Right of Way in Traffic for Safe Buildings\u201d"},"content":{"rendered":"<p>Albayrak Beton Chairman of the Board Erdal Albayrak stated that one of the foremost factors directly affecting earthquake safety in housing is the time required to pour ready-mixed concrete. Albayrak said, \u201cReady-mixed concrete must be poured within a maximum of two hours; otherwise, it loses its properties. Considering Istanbul traffic, concrete mixer trucks should be placed in the category of \u2018vehicles with right of way in traffic\u2019.\u201d<\/p>\n<p>Drawing attention to the importance of concrete\u2014one of the first materials that comes to mind regarding earthquake safety and construction durability\u2014Erdal Albayrak underlined that the factors directly affecting residents\u2019 safety are not only the quality of the ready-mixed concrete but also the time it is poured, its placement, and its curing.<br \/>\nEmphasizing that the strength of ready-mixed concrete changes over time after it is poured, Albayrak noted that it is vital for mixer trucks to deliver the concrete to the pouring site within two hours and that concrete mixer trucks should therefore be given right of way in traffic.<\/p>\n<p>Providing further details, Erdal Albayrak said, \u201cReady-mixed concrete, now the most preferred material for the construction industry, enables projects to progress quickly and efficiently. Yet there is a critical detail: ready-mixed concrete must be poured within a maximum of two hours. After two hours, the concrete loses its properties. For this reason, concrete mixer trucks must be accommodated in Istanbul traffic\u2014indeed, they should have right of way. Concrete quality has a direct impact on human life. The distance between the concrete plant and the pouring site is crucial. Because it is a dusty, busy operation with heavy vehicle traffic, plants cannot be set up just anywhere. Just as gas stations have designated locations, ready-mixed concrete plants must also have permits at strategic points.\u201d<\/p>\n<p>Albayrak stressed that when concrete is combined with rebar, statics, and workmanship, a reinforced-concrete structure is created, but because concrete has the largest mass, it is the most critical parameter in an earthquake. He added that truly earthquake-safe buildings require all these parameters to come together optimally: \u201cWe view every batch of concrete we pour as an investment in human life or as a product made to safeguard lives. We strive for production with pharmaceutical-grade precision.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2.jpg\" alt=\"\" width=\"2500\" height=\"1668\" class=\"aligncenter size-full wp-image-51309\" srcset=\"https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2.jpg 2500w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-500x334.jpg 500w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-629x420.jpg 629w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-120x80.jpg 120w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-1536x1025.jpg 1536w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-2048x1366.jpg 2048w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-600x400.jpg 600w, https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-2-130x87.jpg 130w\" sizes=\"auto, (max-width: 2500px) 100vw, 2500px\" \/><\/p>\n<p><strong>\u201cWe Tolerate Possible Errors of Our Stakeholders\u201d<\/strong><\/p>\n<p>\u201cWe keep our standards at the maximum level, pushing beyond the standard. As much as possible, we try to produce concrete that can tolerate potential errors of the stakeholders who come after us. The transport stage also requires quality management. You must use your vehicle fleet and chosen routes efficiently so the quality of the product you produced is not compromised during transport. Legally, our quality journey ends at the end of our pump hose before the concrete is placed in the formwork. But the concrete\u2019s quality journey continues. Our stakeholders are those who place the concrete, prepare the formwork, and carry out the curing process. If these steps are done correctly, the final product is of high quality.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Albayrak Beton Chairman of the Board Erdal Albayrak stated that one of the foremost factors directly affecting earthquake safety in housing is the time required to pour ready-mixed concrete. Albayrak said, \u201cReady-mixed concrete must be poured within a maximum of two hours; otherwise, it loses its properties. Considering Istanbul traffic, concrete mixer trucks should be [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":51307,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[254],"tags":[],"class_list":["post-51997","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-headline-news"],"jetpack_featured_media_url":"https:\/\/orsiad.com.tr\/wp-content\/uploads\/2025\/03\/Erdal-Albayrak-1.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/posts\/51997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/comments?post=51997"}],"version-history":[{"count":1,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/posts\/51997\/revisions"}],"predecessor-version":[{"id":51998,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/posts\/51997\/revisions\/51998"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/media\/51307"}],"wp:attachment":[{"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/media?parent=51997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/categories?post=51997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/orsiad.com.tr\/en\/wp-json\/wp\/v2\/tags?post=51997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}