Focused on the elaboration and manufacture of wooden flooring, it gets a yearly supply of 200,000 m3 of raw materials from the two hemispheres, but mainly from North America, Brazil and Africa. The annual production capacity exceeds 2 million m2 of wooden flooring and 3 million m2 of multilayer parquet.
Presently, the industrial facilities of MADERAS IGLESIAS consist of two factories located around the city of Vigo, precisely in Mos and Porriño, covering a surface of half a million m2 and including the biggest covered import-wood store in Europe.